Your Space Ready the Day We Leave

Post-Construction Cleanup and Inspections in Pinellas County

Your project in Pinellas County is built, but the space is still covered in drywall dust, wood scraps, and adhesive residue. Windows are smeared, floors need sweeping, and you cannot move in until someone verifies that everything works and meets code. SANDTEK provides post-construction services that include thorough cleanup, detailed inspections, and organized handover, so your property is polished and ready for immediate use.


We remove all construction debris, vacuum dust from vents and surfaces, clean windows and fixtures, and haul away leftover materials from your Pinellas County site. Our team conducts final inspections to confirm quality, safety, and compliance with your project specifications. We then manage the handover process, walking you through completed work, providing warranties and documentation, and answering any questions about maintenance or operation.


If your construction project in Pinellas County is nearing completion and you need cleanup and final inspections handled, contact SANDTEK for a no-cost estimate.

What We Do After the Last Nail

We start by removing large debris, then sweep and vacuum every surface in your Pinellas County property. Windows are wiped down, floors are mopped, and fixtures are polished. HVAC vents and returns are cleaned to remove construction dust. We inspect door operation, test outlets and switches, check plumbing for leaks, and verify that finishes meet your specifications.


After completion, you will notice clear sightlines through windows, floors free of grit, and air that does not smell like sawdust. Switches work without sparking, doors close without rubbing, and faucets run without dripping. The space feels finished and functional.


Our crew brings HEPA vacuums, microfiber cloths, and cleaning solutions safe for new finishes. We haul debris to local disposal facilities and provide documentation for any materials recycled or donated. This service does not include landscaping or exterior power washing, though we do remove construction materials from outdoor staging areas. The process transitions into your occupancy or the next phase of property use.

It Is Fine to Ask What Happens Next

Homeowners and property managers in Pinellas County often ask how long cleanup takes, what the inspection covers, and when they can safely occupy the space. These five questions cover the most common concerns.

How long does post-construction cleanup take?

Most residential cleanups take one to two days depending on square footage and dust levels. Commercial spaces may require additional time for HVAC cleaning and floor care.

What does the final inspection include?

We check all fixtures, outlets, doors, windows, and finishes for defects or incomplete work. Any issues are documented and addressed before handover.

What happens to leftover materials?

We remove all scrap lumber, drywall, packaging, and unused materials from the site. Reusable items are donated or returned to suppliers when possible.

Why is HVAC cleaning necessary after construction?

Drywall dust and sawdust settle in vents and ductwork, reducing air quality and clogging filters. We vacuum vents and replace filters to restore proper airflow.

When can I move furniture into the space?

You can move in as soon as cleanup is complete, inspections pass, and any final touch-ups are finished. Most spaces are ready within 24 hours of our final walkthrough.

SANDTEK completes post-construction services across Pinellas County, ensuring your property is clean, safe, and ready for use the day we leave. If your project is wrapping up and you need cleanup and inspections managed, reach out to schedule your handover.