Reconfigure Your Home's Interior Layout
Layout & Space Modifications in Pinellas County
You live in a Pinellas County home where the walls no longer serve your routines. Rooms feel disconnected, hallways cut through living areas awkwardly, and closets occupy space that could be better used. When surface-level updates will not solve the issue, adjusting the layout itself becomes the only way forward.
SANDTEK handles layout modifications that require structural understanding and permit coordination. We remove non-load-bearing walls, reposition doorways, expand kitchens into adjoining rooms, and reconfigure floor plans to improve flow. Every change meets building code and safety requirements applicable in Pinellas County. Work includes framing adjustments, header installation, electrical rerouting, and drywall repair to match existing finishes.
If your home's layout limits how you use your space, reach out to discuss what modifications are possible in Pinellas County.

How Structural Changes Affect Everyday Movement
You will notice the difference as soon as framing is repositioned. Removing a wall between your kitchen and dining room in Saint Petersburg creates sightlines that let you supervise children while preparing meals. Widening a hallway reduces bottlenecks during morning routines. Relocating a doorway can eliminate wasted corner space and open room for furniture placement.
After the work is complete, you walk through rooms without navigating awkward transitions. Light reaches areas that were previously boxed in. Furniture arrangements become intuitive rather than forced. The home feels larger without adding square footage.
We coordinate inspections, pull permits when required, and work with engineers if load-bearing elements are involved. Electrical and plumbing lines are rerouted as needed. Flooring transitions are leveled and matched. HVAC adjustments are made if airflow patterns change. The service does not include full additions or exterior wall modifications.
Questions That Come Up Before Changing a Layout
Homeowners often need clarity on what layout changes require structurally and how long the work takes to complete.
What determines whether a wall can be removed?
We assess whether the wall is load-bearing using framing direction, foundation layout, and roof truss placement. If it supports weight, we install a beam and posts to transfer the load before removal.
How long does a typical layout modification take?
Removing a single non-load-bearing wall and finishing the surrounding surfaces usually takes three to five days. Projects involving multiple rooms, electrical rerouting, or permit inspections take longer.
What happens to flooring when walls are removed?
You will see a gap where the wall sat. We patch the subfloor, then match the existing flooring or install a transition strip if materials differ.
Why does some layout work require permits?
Any modification affecting structural elements, electrical systems, or plumbing must be permitted and inspected to confirm it meets safety codes. We handle the filing and coordinate inspections.
SANDTEK provides layout modifications that meet code requirements and improve how your Pinellas County home functions daily. If your floor plan no longer fits your needs, contact us to review what changes are feasible.
